
INSTRUCTION MANUAL MM-219JReplacement Head Mechanism®Replacement head mechanisms can be installed withoutdisturbing existing equalizing connections or
KTo prevent serious personal injury from steam pipe blowdown, connect a drain pipe to the control opening toavoid exposure to steam discharge.Failure
11MAINTENANCESCHEDULE:Blow down control as follows when boiler is in operation.• Daily if operating pressure is above 15 psi.• Weekly if operating pre
Xylem Inc. 8200 N. Austin Avenue Morton Grove, Illinois 60053 Phone: (847) 966-3700 Fax: (847) 965-8379www.xyleminc.com/brands/mcdonnellmillerMcDonnel
2Enclosure rating: NEMA 1 General PurposePump Circuit Rating (Amperes)Voltage Full Load Locked Rotor Pilot Duty120 VAC 7.4 44.4345 VA at240 VAC 3.7 22
3ApproximateDistance AboveCast Line DifferentialSetting In. (mm) In. (mm)Motorized15/16 (24)Valve Closed5/16 (8)Motorized5/8 (16)Valve OpenBurner
4PUMP #1OFFPUMP #1ONNORMAL BOILERWATER LINE(19mm)3/4"DIFFERENTIALPUMP #2 ONAT CAST LINE7/8"DIFFERENTIAL(22mm)PUMP #2ONPUMP #2OFFPUMP #1OFFPU
• To prevent serious burns, the boiler must be cooled to 80˚F (27˚C) and the pressure must be 0 psi (0 bar) before servicing.• To prevent electrical s
d. Using a wrench, insert the eight (8) bolts andtighten them to approximately 14-20 ft•lb (19-27 N•m) in an alternating star pattern.GJb. Align the b
7IMPORTANT: There must be aminimum space of 1/2" (13mm)between connector fittings andelectrical live metal parts.STEP 3 - Electrical Wiringa. Rec
8Switch OperationFor all Models except 158S and 159SFor Model 158SBoiler feed pump off,burner on, alarm off.Boiler feed pump on,burner on, alarm off.B
9WIRING DIAGRAMSFor Motorized Valves, refer to the valve manufacturer's wiring instructions.Pump Control Only1. Install a starter or relay in pum
Comments to this Manuals